Commissioned 2014
Process High-Dust

Typical Operation

Flue gas 310-330°C
  180.000 Nm³/h
Dust 100 g/Nm³
Layers  
NOX,in 1700 mg/Nm³
NOX,out  200 mg/Nm³
NH3,out  <10 mg/Nm³
VOC reduction  
Fuel  

 

Through the use of the newly built Pre Heater Tower, it was possible to integrate the SCR with minimum space requirements. Elex CemCat AG delivered SCR, SNCR including Ammonia Storage.

 

 

 


   

Semi-Dust, America

Commissioned 07/2013
Process Semi-Dust

Typical Operation

Flue gas 300°C
  157.000 Nm³/h
Dust 250 mg/Nm³
Layers 2 in operation
NOX,in  
NOX,out  
NH3,out  
VOC reduction  
Fuel  

 

Elex CemCat AG together with Polysius Atlanta built their first Semi-Dust SCR for a cement plant on the continent of America

 

 

 

 

  
 

Schwenk Zement KG, Mergelstetten Plant, Germany

Commissioned 04/2010
Process High-Dust

Typical Operation

Flue gas 380-400°C
  180.000 Nm³/h
Dust 80-90 g/Nm³
Layers 4 in operation
NOX,in 1100-1300 mg/Nm³
NOX,out 200 mg/Nm³
NH3,out < 5 mg/Nm³
VOC reduction 65-70%
Fuel 60-100% alternative fuels

 

Homogeneous  gas distribution at the SCR inlet has made it possible to dismantle the metallic grid (dummy layer) without any negative impact on reliability and performance. The result is a reduction in investment and operating costs.

SCR is combined with an already operational SNCR installation.

The high flue gas temperature creates a sticky dust environment. Our tailored solution is operating under these conditions since May 2010.

 

  

Cementeria di Monselice, Italy

Commissioned 05/2006
Process High-Dust

Typical Operation

Flue gas 320-330°C
  110.000 Nm³/h
Dust 100 g/Nm³
Layers 4 in operation
NOX,in 1100-1300 mg/Nm³
NOX,out 200-400 mg/Nm³
NH3,out < 5 mg/Nm³
VOC reduction 65-70%
Fuel Petcoke

 

Proven reliability and uninterrupted long-term operation with dust cleaning tailored to cement applications.